Jen is getting on a plane tonight to visit her sister, who is due to deliver a baby any minute now. We originally scheduled the flight and our plans around the baby being induced on Saturday, but a serious lapse in communication between expectant mother and doctors revealed that nothing was actually scheduled and there was nobody available to deliver on the weekend, so now it’s on for Monday. Which means that everyone who went north to lend support will probably miss the birth. I have thoughts, Internet, but I won’t share them here.
So Finn and I are winging it this weekend. We’re scheduled to learn how to make maple syrup tomorrow morning, taking advantage of a break in the cold weather, which should be lots of fun, and my hope is to stay outside for as long as possible to soak in some fresh air. Sunday we have some morning obligations and then we’ll probably do a bit of shopping to stock up before Mama gets back.
A box arrived for me at work this week with some replacement goodies for my home built loudspeakers. I got two replacement tweeters, two ABS molded ports, and eight rubber feet for the bottoms. Wednesday night I started replacing the hack wiring job I did in my freshman dorm with a cheap soldering iron and speaker wire; this time it’s new 14 gauge copper, clean solder and heatshrink over everything. As it turns out, the ports I bought are way too wide for the top of the enclosures, so I’ll either have to return them or find a different place for the vents. I may switch it up and put them in the back depending on how much clearance I’ve got; I don’t think this will affect the sound quality at all. Hopefully I can get a little time over the weekend to finish the other side and start making some holes for the ports and tweeters, and finish buttoning these cases up.