Pique the cat, after a long dry spell, has been two for two vs. our household mice this week. On Monday he dropped a very dazed adult mouse on the floor in front of Jen as she lay in bed; I was able to trap it under a glass and release it (well, honestly I flung it) on the lawn of the church across the street. Tuesday evening he did the exact same thing at the same time of the evening, and I trapped and flung this one further away from the house. I don’t think they were the same mouse, but I’m hoping the extra distance and Frederick road dissuaded the two of them from coming back.

After suffering through spotty wireless connectivity at the house (and the attendant expensive cellular data bills), I used some money from my first paycheck to purchase a new Airport Express, which should be here today. At that point I’ll shut the wireless built in to our FIOS router off for good and hopefully we can save some money.

Last weekend I got the IPA kegged with Finn’s help and got it set up for gas; unfortunately I lost the better part of a Co2 bottle and about 4 pints to a faulty dip tube in the Dubbel keg, so I had to drag Finn to the homebrew store for some gasketry and supplies. I still seem to be having issues with the one-way valve I installed on the gas line, and I need a new shank for my second tap line, so I’ll have to go back out this weekend for another trip. But the IPA tastes very good!

Last night I started cutting sheets of MDF board down for new speaker cabs, based on new calculations and the hardware I’ve got. I have to replace the original the tweeters I bought in 1992, one of which has died mysteriously, so I found a new inexpensive set that should be easy replacements. I’m cutting the wood down on a table saw and making everything with 45˚ joins, which will help make these cabs much more aesthetically appealing than the last ones. I’m also going to be buying premade ports and tuning them specifically to the cabinets, as opposed to roughing in ports made from wood, rubber feet, and new binding posts for the wiring.

Date posted: November 21, 2013 | Filed under brewing, finn, projects | Leave a Comment »

Comments are closed.