Well, this week has been a real test of my sanity; there were points when I felt like I was doing OK and at other times I was a terrible husband, father, and Co-Acting-Director-whatever. I’m not used to the sheer amount of meetings coming at us now, and the immediate need to be caught up with all of the inside information we don’t know is overwhelming. My friend Lauren comiserated with me last week, saying, one day you’re looking around for the adult in the room to make a decision, and you suddenly realize that’s you. So much truth in that observation.

Stories to Watch launched on time after an intense three weeks of shooting, editing, organizing, and producing. This year’s production was, in a lot of ways, easier than last year’s (and I wasn’t trapped in my bedroom with COVID, which was nice) but other stressors were still front and center up until the morning of the event. The video portion, if I do say so, looked fantastic. We got a lot of great feedback on the presentation, and when I was in the office later that day, my CEO found me and shook my hand to thank me and the team for all our work. That felt very good.

I was in the office not for the event, but because I had to help another team mix epoxy and glue laser-etched plaques to the front of five trophies that had been 3D printed with sand and shipped from Germany. Don’t let ’em tell you different: the life of a Co-Acting-Director-whatever is full of glamour. Due to some internal production confusion we had to source the plaques and some laser-cut felt to complete the pieces in-house, so I brought tools and a pile of nitrile gloves and we got down to business. They made me glue and set the plaques: no pressure. This coming Tuesday I’m headed up to New York City to help produce the awards event itself, where I’ll be shooting video. Two nights in Manhattan ain’t so bad, I guess.

Meanwhile we visited with Jen’s Dad last Saturday, and I got to work setting a subfloor in the common bathroom. This involved cutting and fitting two sheets of waterproof hardi-board, mixing a bed of thinset, and setting them in place before screwing everything down. It went in with only a few small hitches, and should be good to go for the next step: this coming weekend I’m renting a wet saw and laying the tile. It did involve a ton of work on my knees, cutting, fitting, troweling, and screwing, and I felt it in my back that evening. Between that and 9-hour days at my desk my whole body is pretty pissed at me right now. Hazel got her first walk in 5 days this afternoon; it was like we’d sprung her from Solitary.

And the built-in project is moving along. I found a decent 12′ board for the top shelf and cut it into place. Then I cut and fit small insets under each of the shelves that dress up the horizontals and give them a little visual weight. Jen and I discussed how to finish off the top and after some negotiation we agreed upon a solution to box in and frame out the top shelf with a section of moulding that matches the stuff above all our windows. So I’ve got to get a 12′ piece of that from the mill in Glen Burnie on a dry sunny day ’cause it won’t fit inside the car.

Date posted: January 27, 2023 | Filed under family, house, WRI | Leave a Comment »

Leave a Reply

Your email address will not be published. Required fields are marked *