Here’s where we are with the shower as of today. Brian was in yesterday and made huge progress on the north wall (left side) and begun the back wall up to where the niche starts. It’s really beginning to come together.

We’re getting somewhere between 4-6″ inches of snow right now, so I’m working from home. Jen made some eggnog pancakes and bacon and we all noshed on that for breakfast, and a little after lunchtime we went over to the Elementary School for some sledding. As of 2PM it had stopped snowing, and tomorrow’s forecast is for 50˚ so I doubt there will be anything left when I get home after  work.

I finally kegged the IPWhatever I’ve had sitting in the fermenter for four months; I dry hopped it at least a month ago but never pulled it out into a secondary to filter so I have no idea what to expect in terms of flavor. It could taste like shit or it could be the best beer I’ve ever produced; I’ll never be able to recreate it in any case. It’s currently carbing in the cooler, and should be ready to pour by the weekend.

Date posted: February 20, 2019 | Filed under bathroom, brewing | Leave a Comment »

Leave a Reply

Your email address will not be published. Required fields are marked *