Jen is always a tricky woman to buy Christmas presents for. She really doesn’t want for much, at least, not in the way of stuff, so it’s hard to find just the right thing for her every year. I’ve taken to writing down gift ideas in February so that I don’t forget them in November. Two years ago I was super-romantic and bought her a 40 gallon fish tank to replace the yard-sale sourced starter tank she was working with. She was surprised and it went over well, I think. Last year sucked ass but I was conscious enough through pain meds to buy her a couple of items from Emily McDowell, including a tote bag emblazoned with the words “Groceries and Shit” in beautiful hand lettering.

This year she’s asked for several house-related things, including some shelves for the living room. We’ve had a blank wall in there for years, waiting for some mystery artwork to appear, but she’s sick our shrine to emptiness and asked me to make something to mount to the wall to put stuff on. I looked around Amazon and found some invisible hangers for shelving, and Sunday Finn and I hit the Home Depot for supplies. We got a sheet of 1″ MDF and cut it down to 4′ x 4.5″, then glued and double-stacked four sheets for two shelves. Next I’ll be cutting down a 3″ furring strip and mounting it to the front for a slipguard. When the mounts come in I’ll drill holes and set them up staggered on the wall so that there’s some space on the end for something tall.

Another thing she’s asked for is if we can finally finish the woodwork in the office and den. Sometime between the installation of the front porch windows and the big side window, Lowe’s/Home Depot stopped carrying the equivalent cap molding to our windowframes in stock. This is somewhat short-sighted, because I’d wager EVERY HOUSE IN MY NEIGHBORHOOD uses this same cap molding. I’ve looked into setting up a router jig and making it myself, but I’d probably spend several thousand dollars on the jig and I’d honestly much rather have a finished bathroom. I found a woodworking shop over in Glen Burnie who I’ve been told can make this molding for me, and hopefully it won’t be too expensive, because I need 65+ linear feet of it.

* * *

I spent a little time kegging beer last night. My intention was to get the grapefruit IPA in the cooler, but for some inexplicable reason I transferred the session IPA and added grapefruit extract to that instead. So it’s going to be an intense batch of beer. I doubt it’s ruined but now I’ve got to figure out what to do with the base beer for the original grapefruit batch–it’s probably a lot milder than the session, so it won’t be as good on its own. Looks like I might wind up with two grapefruit batches instead of one, unless I decide to dry-hop this batch for flavor.

I spent a good chunk of the weekend grading my first class project. Friday night I reviewed work, looked over their files, and filled out a checklist for each project. Saturday morning I fed that into a spreadsheet which averages the score from the checklist and converts that to a letter grade, and from there I adjusted up or down based on attendance. Saturday evening I filled out most of the comments at the bottom of each grading sheet (because what are grades without feedback?) I built this system after realizing how time-intensive grading is during my first semester, and it’s paid off really well.

Date posted: November 12, 2018 | Filed under brewing, house, porch, teaching | Leave a Comment »

Leave a Reply

Your email address will not be published. Required fields are marked *