- Pulled the rear tires off the Accord to diagnose brake squeal.
- Had the rotors and pads replaced by the pros for time’s sake.
- Fixed the hose bib on the west wall.
- Cleaned rooting cedar trees from the north side second story gutter (and then the first story too).
- Sealed the foundation around the first floor toilet cleanout.
- Cleaned black sealant goop off the spare Scout windshield.
- Put oil in the Scout, which was a quart low.
- Replaced three exploded bricks in the front walkway.