That area above the porch roof is now blue, and the three ghetto windows have been scraped and glazed. This is the second-to-last major section of siding that needed to be painted, and these windows are probably in the worst shape compared to the rest. For some reason, there were never any storm windows installed on the atrium, so the windows took a beating. Next up is a good priming and then two coats of high gloss enamel.