Pledge week on NPR. Ugghhh.
The medicine cabinet is finished on both sides and just about ready for a coat of paint. I followed the pattern throughout the rest of the house and milled down a smaller-scale version of the framing on the bathroom side. The next step is to build a beadboard-faced door and install that on the bathroom side with a latch. Then the whole thing gets a sanding, priming, and then we’re ready to paint.
Seen on a bumper sticker on the way to work this morning:
We are making enemies faster than we can kill them.
Amen, brother.
Close…But No Scout. I took a drive to Sterling this Saturday to look at a Scout for sale, in the hopes that the tub would be good enough for donor status. On further inspection, the A and B pillars were perfect, the hood and front fenders were almost stock, and the top was sprinkled with surface rust. The rear quarters, however, didn’t hold a magnet, and a very rudimetary bondo sanding job was visible under the paint. The tailcaps were completely shot, although he had a pair of clean replacements to go along with the truck. She started up and ran well, and I considered the deal for a long time before deciding to pass. With all the work needed to clean up the rear of the tub, I’d rather buy a fiberglas tub and never have to worry about rust again. So, the search continues.
So I focused my sorrows on something else: Three more storm windows were installed, the east side windows got their final coat of paint, and ½ of the medicine cabinet is fabricated and ready for installation. I’m hoping to finish the inside and put the door on this week—then we can paint and the linen closet will be complete.
→ This is a syndicated post from my Scout weblog. More info here.