I ran down to the dump this morning after we made sure Finn got on the bus for school; I’d filled the back of the CR-V with construction debris yesterday and tried to drop it off, but everything was closed for the holiday.
All nine new replacement windows are installed, caulked (inside) and painted, and the window treatments are back in place. I’ve noticed a drastic difference in the amount of noise pollution they block out in all of the rooms upstairs. I began installing them at the tail end of the cold snap, and then the weather rocketed into the 50’s in the middle of the job so I can’t yet say they are keeping things warmer, but I notice the drafts have disappeared and the light coming in is brighter and clearer. It feels great to have that project complete.
Next up is one of Jen’s Christmas presents: she’s wanted a built-in bookcase in the living room for years, so I came up with a plan to put one in against the south wall around the main windows. It’s going to take some engineering and a lot of specialty carpentry, but I’m looking forward to the challenge. What we’re doing is a floor to cieling built-in with a small boxed section at the bottom to hide (and keep intact) the original kickplates. The biggest wrinkle is the radiator pipe on the left side going up to the back bedroom, which I’ll have to fit the shelving around.
The other thing we’re doing is leaving all of the original woodwork alone—I don’t want to chop the edges of the crown molding or the windowsill off like they did upstairs in the back bedroom. And the radiator cover isn’t exactly the width of the windowsill—it’s slightly larger. So there’ll be a tiny gap between the inner edges of the shelves and the window moulding.