It’s been a minute since I posted; it’s been a busy couple of weeks. We’ve been organizing for and shooting the prerecorded section of WRI’s annual Stories To Watch, which is always a huge undertaking. Every year we up our game and this year was no exception. For 2023 we found a studio facility in Chantilly to shoot at with a 40’ wide, 14’ high LED background that we had to fill with content. My video team rose to the challenge and built a looping background from an Illustrator file I made, and we produced an 80 slide, five chapter presentation from a rough deck in four days. Our CEO walked in on the first day and was amazed at the LED wall lit up and running the animations; the whole team knocked it out of the park. We booked the studio for two days, so I stayed overnight in a hotel down the street because the commute home is at least two hours—and we used every hour of those two days.
While that was happening, there have been some changes going on behind the scenes in my department. One of my oldest colleagues and current boss is moving on from the organization, and I volunteered to fill in temporarily with another colleague until they find our next VP of Communications. I’m excited to help keep things moving and slightly terrified of all of the things I don’t know, but a new challenge will be good to tackle. So for now, I’m co-Acting Head of Communications. Wish me luck.
While I’ve been scrambling at work there hasn’t been much progress on the bathroom beyond what I did last weekend. All I’ve got to do is sand the drywall and hit it with a cat of paint and then I can screw the fixtures in for good and take a picture for Cousin Margaret.
On Sunday I’m headed up to PA to look at another Scout 800 tucked in a barn; I’ll detail the details on the Scout site later. Monday I’m going to start work on the built in bookcase in the living room for a change of pace.