This was a quiet weekend of Getting Things Done:
- I replanted the surviving tomato seedlings into potting soil and let them harden in full sunlight for the entirety of Saturday. I made the mistake of leaving them out in the greenhouse for an hour too long last Thursday and they all got toasted in the mixture of heat and humidity, so the last few days I’ve been nursing them back to health. All of the cherries, about 70% of the Chef’s Choice, and three Cherokees out of ten survived. So I may have to break down and buy some other varieties from the store just to mix up the crop. Still, this is the first time I’ve grown anything from seed, and I’m pretty stoked.
- Pumped 45 gallons of rainwater into the greenhouse barrel from the garage barrel, in advance of a new week of rainfall. Before it was filled last week I pressure-washed all of last year’s green slime from the inside, so they’re both clean.
- Dumped all of last year’s soil from the containers out behind the neighbor’s garage and replaced it with 15 cubic yards of fresh container soil, ready for healthy seedlings.
- Wiped a couple of years’ worth of algae off the insides of the polycarbonate walls of the greenhouse; it’s like someone opened the drapes in there.
- Replaced the front and rear brake lines on my road bike, wrapped it in grip tape, and took a shakedown cruise up to the post office to mail off a Netflix disc. I like the cowhorns better than the old drop handlebars, but I wish they were about 2″ narrower and didn’t have a bend. That being said, it’s great to be on a bike again, but I feel the complete lack of conditioning in my legs about 100 yards up the road from our house. Time was when Pat and I would ride 20 miles around Baltimore on a whim (without helmets or healthcare, at midnight) and barely feel winded; it’s obvious I need to get out and ride a lot more. Finley’s bike is now too small but it’s impossible to shop properly for a full-sized bike during lockdown, otherwise I’d get her out for a ride every day.
- Painted a second coat of semigloss on the porch ceiling, crown moulding and window surrounds, and a second coat of eggshell on the walls. I also taped up the remaining seams in the original drywall and I think I can stretch the mud I’ve got to cover the remainder. Sunday I spent pretty much the whole day painting trim, first in eggshell primer (whoops) and then a second coat of semigloss white over everything. We’re reaching the end of the painting portion of this project, which means it’ll soon be time to rip up the carpet and move on to the flooring.
- Failed to empty the second keg of the IPA that’s been in there since last July; I sipped on it for most of this afternoon and poured a bunch into a growler, but it’s still not kicked. So the Shiner Bnock-off is still sitting in the carboy waiting its turn. And look! I got a new IPA kit in the mail from Northern Brewer on Saturday.
- Ordered a 24-port network switch from Amazon to replace the castoff unit I’ve had in the basement since 2018. I got it from the electronics dumpster at WRI in 2017 or so when they simplified the internal network and upgraded the gear, so it cost me nothing, but it has been running nonstop since about 2005 and thus the internal fans are both crispy. It’s been making terrible whining noises for a couple of weeks which tells me the whole thing is about to crap out, so I figure I’ll get ahead of that while I can. I also ordered a box of 100 RJ-45 connectors so that I can simplify the wiring situation while I’m down there.