Football is over and now it’s basketball basketball basketball, which is my least favorite time of year. Not because I love football, but because I pretty much despise basketball, and it’s a long couple of months before anybody starts talking about baseball, which is only marginally more interesting than basketball.

I got about five hours up in the bathroom on Saturday and had to do a bit of catching up to see where I’d left things. First on the list was to set the right-side front cabinet in place, level it, and then reset the left side to match the height. Because of the way the walls and floor slope, I had to shim the right side a fair bit to get it to level, requiring the left side to be raised up about 1/2″. Now that all of the cabinets are set, I pulled the toekick skin out of its package and started measuring. Toekick skin is the stuff that goes across the base of the cabinet, from the floor to the section that juts out. Unfortunately what I have is all sized for a flat, level installation and doesn’t give me any extra for overage, so I re-ordered a batch with an extra inch of height to cut down.

I finished the moulding in the closet, shimmed one of the doors out so that it will close properly, mudded the edge of the shower wall, and did a lot of finish work throughout, as well as cleaned up the whole room. Without the countertops, toekick moulding, a strip of cabinet edge finish, and something called scribe moulding to finish off the top edge of the linen cabinet, I’m at a bit of a standstill. All of this is on order—I’m waiting to get the quote back for the countertops this week.

DSCF7720

I got the Scout out of the garage and made a dump run on Saturday morning with Hazel. We were able to haul all of the old windows, their weights, and two giant bags of trash out of the backyard, which is a great relief.

On Sunday I couldn’t venture far from the house, as I had the dog and the girls to watch (Finn had a friend over) so I put the dog outside and started cleaning up the basement. I’ve had a pile of lumber on the main section of the floor for months and decided I’d use some of the leftover scraps from the bathroom to build a simple overhead rack for 6+’ lengths. Once that was done the rest of the floor cleaned up quickly.

Then I went and looked at the two kegs of beer in the kegerator. Last I remembered one was empty. I figured it was time to get it out and clean it, so I disconnected everything and lifted them both, and found they both still had beer inside. So I cleaned out the hoses and taps (the taps were disgusting) hooked up the gas, and poured a glass of beer. I’d forgotten exactly why I’d disconnected the grapefruit IPA, and after having only about half a glass, just how powerful it was. Still, it’s nice for sipping.

* * *

Then I looked over the road bike. Last week I was able to get the old bars off, the new bullhorns on, and mount the brake levers. But I haven’t been able to get the old brake levers and cables disconnected. Most of the replacement kits I’ve seen have a particular type of cable and housing, with two kinds of barreled tips at the ends of the cable. This bike has neither. It’s so old the cable was custom-cut and threads through the old Dia-Compe brake system. The cable doesn’t even come off the brake levers—it’s built into them. So I cut off one end and removed the front brake lever; now I have to sort out what to do next. I’m resisting the urge to bring it to the bike shop and have them fix it, because there’s no rush and I have to remind myself that this is part of the fun.

Date posted: February 10, 2020 | Filed under bathroom, brewing, family | Leave a Comment »

Leave a Reply

Your email address will not be published. Required fields are marked *