There’s a crew outside with a bobcat scraping inches of dirt, rock, and mulch off the top of the driveway to prepare it for crushed gravel. They’re going 3″ down before they build things back up, so they’ve already uncovered a hand-built “drain” that was put in to the right side of the garage door at some point 30 years ago which had completely collapsed. All of the mulch is gone, as is the curb on the far side. We’re widening out the front to make it a true two-lane driveway, as well as building up and leveling off the far side so that we don’t need to continually parallel-park on a slope.

It’s about 16′ at its widest, which is a tight two-car width, but that’s worlds better than a 1-car dirt pathway. And that fucking curb is gone! They’ll be back to put down the asphalt tomorrow.

Date posted: October 28, 2019 | Filed under comparison, house | Leave a Comment »