So between three guys, two days, and twenty sheets of drywall, there are still gaps in the walls in the bathroom. I knew I wasn’t hiring the A-Team here, but the lackadaisical approach to, um, completing the job has been a bit frustrating. They’ve got the majority of it hung, and there’s tape on half of it so far, but I had to have them remove one panel because they screwed it in over an outlet box. As long as I stay on top of them, things should turn out alright.
In the meantime, I’m waffling about what I should do with my old MacBook Pro. Originally I was going to sell it, but the pictures I took for Craigslist disappeared off my camera. At that point I thought about installing Plex and making it into a media server, but talking it over with a friend made me realize I couldn’t hook it up to our shitty TV if I wanted to. So now I may go back to Craigslist and see if I can get $500 for it.