11:30 PM – just up from the basement. I got the right hand side (from the stairs) sheetrocked in; the box containing the stairwell is boxed in and looks pretty good, actually. I got everything done across to the window opening- the upper left side and the way it went together is still bugging me. I have no real way of framing it out or covering it over, and that is going to bug me for a long time. I’m stumped. I did put a brace over the base opening for the window at level, so I can drop a set of planking across it for a real nice windowsill.

Today at work was pretty good- I was able to focus on the interface enough to realize that A. the color choices I made for amber worked equally well as copper, and B. when I added some noise at a 30% screen in the background, it really looked good as copper.

Date posted: September 6, 2001 | Filed under house | Leave a Comment »

Comments are closed.